Back to Projects
Peru · Copper · Zinc · Molybdenum · Silver · Lead
Antamina
Large-scale, low-cost open-pit copper-zinc mine located high in the Peruvian Andes, using a 302 km slurry pipeline to ship concentrates from Huarmey port. Joint venture with BHP (33.75%), Glencore (33.75%), and Mitsubishi (10%).
ExplorationStage · Unclassified Updated November 20, 2026
Project Profile
Key data & status
Operator
Teck Resources Limited
Province / Region
Peru
Commodity
Copper · Zinc · Molybdenum · Silver · Lead
Stage
Unclassified
Status detail
Operating
Project type
mine
Ownership
22.5%
Resource Estimate
—
Production Estimate
400,000 - 450,000 tonnes Cu eq/year (Teck share ~90,000 - 100,000 tonnes Cu)
Mine Life
12+ years (EIA extended operating life to 2036)
Location
Ancash Region
Resources & reserves
| Commodity | Class | Tonnes | Grade | Contained | As of | |
|---|---|---|---|---|---|---|
| copper | proven | 260,200 | 0.84 % Cu | — | 2025-12-31 | Source |
| copper | probable | 268,200 | 0.98 % Cu | — | 2025-12-31 | Source |
| copper | measured | 98,800 | 0.66 % Cu | — | 2025-12-31 | Source |
| copper | indicated | 239,900 | 0.83 % Cu | — | 2025-12-31 | Source |
| copper | inferred | 1,256,300 | 0.97 % Cu | — | 2025-12-31 | Source |
| zinc | probable | 93,300 | 1.9 % Zn | — | 2025-12-31 | Source |
Production history
| Period | Commodity | Ore processed (t) | Output | Cash cost | AISC | |
|---|---|---|---|---|---|---|
| 2025 | copper | 50,327,000 | 381,800 t | — | — | Source |
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to Antamina yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Dec 31, 2025ResourcesProven copper: — kt · Probable copper: — kt · Measured copper: — kt · Indicated copper: — kt
- 2025ProductionOre processed 50,327,000 t
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.