Project Profile
Key data & status
Operator
Capstone Copper
Province / Region
Mexico
Commodity
Copper · Silver · Zinc · Lead
Stage
Production
Status detail
producing
Project type
mine
Ownership
100%
Resource Estimate
—
Production Estimate
~25,000 tonnes copper/year
Mine Life
5+ years
Location
Zacatecas
Resources & reserves
| Commodity | Class | Tonnes | Grade | Contained | As of | |
|---|---|---|---|---|---|---|
| copper | proven | 42,000 | 1.82 % Cu | 1 kt | 2026-01-01 | Source |
| copper | probable | 6,614,000 | 1.39 % Cu | 92 kt | 2026-01-01 | Source |
| copper | measured | 443,000 | 1.31 % Cu | 6 kt | 2025-12-31 | Source |
| copper | indicated | 17,068,000 | 1.29 % Cu | 220 kt | 2025-12-31 | Source |
| copper | inferred | 13,547,000 | 0.72 % Cu | 97 kt | 2025-12-31 | Source |
| silver | indicated | 17,068,000 | 44 g/t | 23,918 koz | 2025-12-31 | Source |
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to Cozamin Mine yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 26, 2026StageStage changed: Unclassified → Production
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Sep 2026ProductionOre processed 334,000 t
- Jan 1, 2026ResourcesProven copper: 1.00 kt · Probable copper: 92.0 kt
- Dec 31, 2025ResourcesMeasured copper: 6.00 kt · Indicated copper: 220 kt · Inferred copper: 97.0 kt · Indicated silver: 23,918 koz
- 2025ProductionOre processed 1,323,000 t
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.