Project Profile
Key data & status
Operator
McEwen Mining
Province / Region
Mexico
Commodity
Gold · Silver
Stage
Production
Status detail
producing
Project type
mine
Ownership
100%
Resource Estimate
—
Production Estimate
Minimal production
Mine Life
Winding down
Location
Sinaloa
Resources & reserves
Production history
| Period | Commodity | Ore processed (t) | Output | Cash cost | AISC | |
|---|---|---|---|---|---|---|
| 2025 | gold | — | 396 oz | — | — | Source |
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to El Gallo Mine yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 26, 2026StageStage changed: Unclassified → Production
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Dec 31, 2025ResourcesMeasured gold: 0.15 Moz · Indicated gold: 0.05 Moz · Inferred gold: 0.00 Moz · Inferred silver: 0.30 Moz
- 2025Production
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.