Project Profile
Key data & status
Operator
Paladin Energy Ltd.
Province / Region
Namibia
Commodity
Uranium
Stage
Unclassified
Status detail
Producing
Project type
mine
Ownership
75%
Resource Estimate
—
Production Estimate
—
Mine Life
—
Location
Erongo Region, Namibia
Resources & reserves
| Commodity | Class | Tonnes | Grade | Contained | As of | |
|---|---|---|---|---|---|---|
| uranium | measured | 95,000,000 | 0.041 % U3O8 | 85.9 Mlb | 2026-06-30 | Source |
| uranium | indicated | 23,100,000 | 0.0375 % U3O8 | 19.1 Mlb | 2026-06-30 | Source |
| uranium | inferred | 11,000,000 | 0.0347 % U3O8 | 8.4 Mlb | 2026-06-30 | Source |
| uranium | proven | 24,700,000 | 0.0326 % U3O8 | 17.7 Mlb | 2026-06-30 | Source |
| uranium | probable | 10,400,000 | 0.0451 % U3O8 | 10.3 Mlb | 2026-06-30 | Source |
Production history
| Period | Commodity | Ore processed (t) | Output | Cash cost | AISC | |
|---|---|---|---|---|---|---|
| FY2026 | uranium | 4,760,000 | 5 Mlb | 43.3 USD | — | Source |
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to Langer Heinrich Mine yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Jun 30, 2026ResourcesMeasured uranium: 85.9 Mlb · Indicated uranium: 19.1 Mlb · Inferred uranium: 8.40 Mlb · Proven uranium: 17.7 Mlb
- 2026ProductionOre processed 4,760,000 t
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.