Project Profile
Key data & status
Operator
Equinox Gold Corp.
Province / Region
Mexico
Commodity
Gold
Stage
Unclassified
Status detail
Producing
Project type
mine
Ownership
100%
Resource Estimate
—
Production Estimate
—
Mine Life
—
Location
Guerrero, Mexico
Resources & reserves
| Commodity | Class | Tonnes | Grade | Contained | As of | |
|---|---|---|---|---|---|---|
| gold | proven | 35,453,000 | 0.77 g/t Au | 877 koz | 2022-06-30 | Source |
| gold | probable | 157,773,000 | 0.88 g/t Au | 4,477 koz | 2022-06-30 | Source |
| gold | measured | 47,306,000 | 1.15 g/t Au | 1,757 koz | 2022-06-30 | Source |
| gold | indicated | 278,020,000 | 0.69 g/t Au | 6,140 koz | 2022-06-30 | Source |
| gold | inferred | 135,935,000 | 0.74 g/t Au | 3,237 koz | 2022-06-30 | Source |
Production history
| Period | Commodity | Ore processed (t) | Output | Cash cost | AISC | |
|---|---|---|---|---|---|---|
| 2025 | gold | — | 33,013 oz | — | — | Source |
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to Los Filos Mine Complex yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- 2025Production
- Jun 30, 2022ResourcesProven gold: 877 koz · Probable gold: 4,477 koz · Measured gold: 1,757 koz · Indicated gold: 6,140 koz
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.