Live · Markets
LiveAUGold3,772USD/oz+0.10%LiveAGSilver45.74USD/oz-0.31%LiveCUCopper5.99USD/lb+0.00%LiveNINickel7.25USD/lb+0.00%LiveLILithium Carbonate24,306USD/t+0.00%LiveUUranium85.55USD/lb+0.00%LiveZNZinc1.66USD/lb+0.00%LiveCOCobalt15.21USD/lb+0.00%FEIron Ore104.30USD/t+0.28%KCLPotash312.00USD/t+0.55%LivePDPalladium959.00USD/oz+0.00%LivePTPlatinum1,372USD/oz+0.00%LiveRHRhodium9,000USD/oz+0.00%LiveALAluminum1.29USD/lb+0.00%LivePBLead0.85USD/lb+0.00%LiveSNTin20.47USD/lb+0.00%LiveMOMolybdenum40.22USD/lb+0.00%LiveNBNiobium48.00USD/kg+0.00%LiveVVanadium14.14USD/lb+0.00%LiveCGraphite (flake)1,250USD/t+0.00%LiveNDNeodymium244.90USD/kg+0.00%LivePRPraseodymium245.40USD/kg+0.00%LiveDYDysprosium930.70USD/kg+0.00%LiveTBTerbium4,029USD/kg+0.00%LiveSBAntimony51.80USD/kg+0.00%LiveBIBismuth67.00USD/kg+0.00%LiveGAGallium2,269USD/kg+0.00%LiveGEGermanium8,598USD/kg+0.00%LiveHFHafnium12,508USD/kg+0.00%LiveINIndium972.20USD/kg+0.00%LiveRERhenium7,283USD/kg+0.00%LiveTETellurium243.30USD/kg+0.00%LiveAUGold3,772USD/oz+0.10%LiveAGSilver45.74USD/oz-0.31%LiveCUCopper5.99USD/lb+0.00%LiveNINickel7.25USD/lb+0.00%LiveLILithium Carbonate24,306USD/t+0.00%LiveUUranium85.55USD/lb+0.00%LiveZNZinc1.66USD/lb+0.00%LiveCOCobalt15.21USD/lb+0.00%FEIron Ore104.30USD/t+0.28%KCLPotash312.00USD/t+0.55%LivePDPalladium959.00USD/oz+0.00%LivePTPlatinum1,372USD/oz+0.00%LiveRHRhodium9,000USD/oz+0.00%LiveALAluminum1.29USD/lb+0.00%LivePBLead0.85USD/lb+0.00%LiveSNTin20.47USD/lb+0.00%LiveMOMolybdenum40.22USD/lb+0.00%LiveNBNiobium48.00USD/kg+0.00%LiveVVanadium14.14USD/lb+0.00%LiveCGraphite (flake)1,250USD/t+0.00%LiveNDNeodymium244.90USD/kg+0.00%LivePRPraseodymium245.40USD/kg+0.00%LiveDYDysprosium930.70USD/kg+0.00%LiveTBTerbium4,029USD/kg+0.00%LiveSBAntimony51.80USD/kg+0.00%LiveBIBismuth67.00USD/kg+0.00%LiveGAGallium2,269USD/kg+0.00%LiveGEGermanium8,598USD/kg+0.00%LiveHFHafnium12,508USD/kg+0.00%LiveINIndium972.20USD/kg+0.00%LiveRERhenium7,283USD/kg+0.00%LiveTETellurium243.30USD/kg+0.00%
Back to Projects
Mexico · Silver · Zinc · Lead

Los Gatos Mine (acquired)

Share

70% JV interest. Acquired through Gatos Silver transaction. Cerro Los Gatos underground silver mine. Produced 9.68Moz silver in 2024.

ProducingStage · Production Updated November 20, 2026
Los Gatos Mine (acquired)
Project Profile

Key data & status

Operator
First Majestic Silver Corp.
Province / Region
Mexico
Commodity
Silver · Zinc · Lead
Stage
Production
Status detail
producing
Project type
mine
Ownership
70%
Resource Estimate
—
Production Estimate
~10M oz silver/year
Mine Life
10+ years
Location
Chihuahua
Resources & reserves
CommodityClassTonnesGradeContainedAs of
silverproven1,970,000231 g/t Ag14.57 Moz2025-12-31Source
silverprobable7,590,00085 g/t Ag20.7 Moz2025-12-31Source
goldproven1,970,0000.25 g/t Au0.02 Moz2025-12-31Source
goldprobable7,590,0000.17 g/t Au0.04 Moz2025-12-31Source
Production history
PeriodCommodityOre processed (t)OutputCash costAISC
2025silver867,4675,869,370 oz12.91 USD15.15 USDSource
2025gold867,4673,121 oz12.91 USD15.15 USDSource
Q3 2026silver226,6891,245,178 oz19.58 USD24.2 USDSource
Q3 2026gold226,689625 oz19.58 USD24.2 USDSource

Compiled from company disclosures. Refer to operator filings for official figures.

Regulatory record

Assessments, permits & orders

0 linked filings

No assessments, permits or orders are linked to Los Gatos Mine (acquired) yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.

Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.

Project history

Timeline

8 events
  1. Nov 26, 2026Stage
    Stage changed: Unclassified → Production
  2. Nov 20, 2026Stage
    First tracked by BedrockBulletin as Unclassified
  3. Nov 20, 2026Stage
    First tracked by BedrockBulletin as Unclassified
  4. Sep 2026Production
    Ore processed 226,689 t · AISC 24.2 USD
  5. Sep 2026Production
    Ore processed 226,689 t · AISC 24.2 USD
  6. Dec 31, 2025Resources
    Proven silver: 14.6 Moz · Probable silver: 20.7 Moz · Proven gold: 0.02 Moz · Probable gold: 0.04 Moz
  7. 2025Production
    Ore processed 867,467 t · AISC 15.2 USD
  8. 2025Production
    Ore processed 867,467 t · AISC 15.2 USD

History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.