Project Profile
Key data & status
Operator
Barrick Mining Corporation
Province / Region
Zambia
Commodity
Copper
Stage
Unclassified
Status detail
producing
Project type
mine
Ownership
100%
Resource Estimate
—
Production Estimate
~300M lb copper/year
Mine Life
20+ years
Location
North-Western Province
Resources & reserves
| Commodity | Class | Tonnes | Grade | Contained | As of | |
|---|---|---|---|---|---|---|
| copper | proven | 150,000,000 | 0.47 % Cu | 0.69 Mt | 2025-12-31 | Source |
| copper | probable | 1,400,000,000 | 0.52 % Cu | 7.4 Mt | 2025-12-31 | Source |
| copper | measured | 190,000,000 | 0.43 % Cu | 0.83 Mt | 2025-12-31 | Source |
| copper | indicated | 1,900,000,000 | 0.49 % Cu | 9.3 Mt | 2025-12-31 | Source |
| copper | inferred | 250,000,000 | 0.4 % Cu | 0.91 Mt | 2025-12-31 | Source |
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to Lumwana yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Sep 2026ProductionAISC 4.61 USD
- Dec 31, 2025ResourcesProven copper: 0.69 Mt · Probable copper: 7.40 Mt · Measured copper: 0.83 Mt · Indicated copper: 9.30 Mt
- 2025ProductionOre processed 25,740,000 t · AISC 3.05 USD
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.