Project Profile
Key data & status
Operator
Capstone Copper
Province / Region
Chile
Commodity
Copper · Silver
Stage
Production
Status detail
producing
Project type
mine
Ownership
100%
Resource Estimate
—
Production Estimate
~50,000 tonnes copper/year
Mine Life
10+ years
Location
Antofagasta Region
Resources & reserves
| Commodity | Class | Tonnes | Grade | Contained | As of | |
|---|---|---|---|---|---|---|
| copper | proven | 53,000,000 | 0.7 % Cu | 374 kt | 2025-12-31 | Source |
| copper | probable | 47,100,000 | 0.51 % Cu | 239 kt | 2025-12-31 | Source |
| copper | measured | 77,500,000 | 0.7 % Cu | 545 kt | 2025-12-31 | Source |
| copper | indicated | 94,800,000 | 0.56 % Cu | 530 kt | 2025-12-31 | Source |
| copper | inferred | 15,100,000 | 0.48 % Cu | 72 kt | 2025-12-31 | Source |
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to Mantos Blancos yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 26, 2026StageStage changed: Unclassified → Production
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Sep 2026ProductionOre processed 1,933,000 t
- Dec 31, 2025ResourcesProven copper: 374 kt · Probable copper: 239 kt · Measured copper: 545 kt · Indicated copper: 530 kt
- 2025ProductionOre processed 7,293,000 t
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.