Project Profile
Key data & status
Operator
New Gold
Province / Region
British Columbia
Commodity
Gold · Copper
Stage
Production
Status detail
Producing
Project type
mine
Ownership
100%
Resource Estimate
—
Production Estimate
—
Mine Life
—
Location
British Columbia, Canada
Map position
Resources & reserves
| Commodity | Class | Tonnes | Grade | Contained | As of | |
|---|---|---|---|---|---|---|
| gold | probable | 39,567,000 | 0.65 g/t Au | 0.83 Moz | 2024-12-31 | Source |
| copper | probable | 39,567,000 | 0.72 % Cu | 286,217 t | 2024-12-31 | Source |
| gold | measured | 51,195,000 | 0.58 g/t Au | 0.96 Moz | 2024-12-31 | Source |
| gold | indicated | 30,448,000 | 0.4 g/t Au | 0.39 Moz | 2024-12-31 | Source |
| copper | measured | 51,195,000 | 0.67 % Cu | 343,823 t | 2024-12-31 | Source |
| gold | inferred | 132,000 | 0.19 g/t Au | 0 Moz | 2024-12-31 | Source |
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to New Afton Mine yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 26, 2026StageStage changed: Unclassified → Production
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- 2025ProductionOre processed 4,422,000 t · AISC 877 USD
- Dec 31, 2024ResourcesProbable gold: 0.83 Moz · Probable copper: 286,217 t · Measured gold: 0.96 Moz · Indicated gold: 0.39 Moz
- 2024ProductionOre processed 4,187,000 t · AISC 835 USD
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.