LiveAUGold3,772USD/oz+0.10%LiveAGSilver45.74USD/oz-0.31%LiveCUCopper5.99USD/lb+0.00%LiveNINickel7.25USD/lb+0.00%LiveLILithium Carbonate24,306USD/t+0.00%LiveUUranium85.55USD/lb+0.00%LiveZNZinc1.66USD/lb+0.00%LiveCOCobalt15.21USD/lb+0.00%FEIron Ore104.30USD/t+0.28%KCLPotash312.00USD/t+0.55%LivePDPalladium959.00USD/oz+0.00%LivePTPlatinum1,372USD/oz+0.00%LiveRHRhodium9,000USD/oz+0.00%LiveALAluminum1.29USD/lb+0.00%LivePBLead0.85USD/lb+0.00%LiveSNTin20.47USD/lb+0.00%LiveMOMolybdenum40.22USD/lb+0.00%LiveNBNiobium48.00USD/kg+0.00%LiveVVanadium14.14USD/lb+0.00%LiveCGraphite (flake)1,250USD/t+0.00%LiveNDNeodymium244.90USD/kg+0.00%LivePRPraseodymium245.40USD/kg+0.00%LiveDYDysprosium930.70USD/kg+0.00%LiveTBTerbium4,029USD/kg+0.00%LiveSBAntimony51.80USD/kg+0.00%LiveBIBismuth67.00USD/kg+0.00%LiveGAGallium2,269USD/kg+0.00%LiveGEGermanium8,598USD/kg+0.00%LiveHFHafnium12,508USD/kg+0.00%LiveINIndium972.20USD/kg+0.00%LiveRERhenium7,283USD/kg+0.00%LiveTETellurium243.30USD/kg+0.00%LiveAUGold3,772USD/oz+0.10%LiveAGSilver45.74USD/oz-0.31%LiveCUCopper5.99USD/lb+0.00%LiveNINickel7.25USD/lb+0.00%LiveLILithium Carbonate24,306USD/t+0.00%LiveUUranium85.55USD/lb+0.00%LiveZNZinc1.66USD/lb+0.00%LiveCOCobalt15.21USD/lb+0.00%FEIron Ore104.30USD/t+0.28%KCLPotash312.00USD/t+0.55%LivePDPalladium959.00USD/oz+0.00%LivePTPlatinum1,372USD/oz+0.00%LiveRHRhodium9,000USD/oz+0.00%LiveALAluminum1.29USD/lb+0.00%LivePBLead0.85USD/lb+0.00%LiveSNTin20.47USD/lb+0.00%LiveMOMolybdenum40.22USD/lb+0.00%LiveNBNiobium48.00USD/kg+0.00%LiveVVanadium14.14USD/lb+0.00%LiveCGraphite (flake)1,250USD/t+0.00%LiveNDNeodymium244.90USD/kg+0.00%LivePRPraseodymium245.40USD/kg+0.00%LiveDYDysprosium930.70USD/kg+0.00%LiveTBTerbium4,029USD/kg+0.00%LiveSBAntimony51.80USD/kg+0.00%LiveBIBismuth67.00USD/kg+0.00%LiveGAGallium2,269USD/kg+0.00%LiveGEGermanium8,598USD/kg+0.00%LiveHFHafnium12,508USD/kg+0.00%LiveINIndium972.20USD/kg+0.00%LiveRERhenium7,283USD/kg+0.00%LiveTETellurium243.30USD/kg+0.00%
Back to Projects
USA · Gold · Copper

Pinto Valley Mine

Share

Open pit copper mine in Arizona. Long-life operation. Production of 57,271 tonnes in 2024.

ProducingStage · Production Updated November 20, 2026
Pinto Valley Mine
Project Profile

Key data & status

Operator
Capstone Copper
Province / Region
USA
Commodity
Gold · Copper
Stage
Production
Status detail
producing
Project type
mine
Ownership
100%
Resource Estimate
—
Production Estimate
~57,000 tonnes copper/year
Mine Life
10+ years
Location
Arizona
Resources & reserves
CommodityClassTonnesGradeContainedAs of
copperproven249,500,0000.32 % Cu803 kt2025-12-31Source
copperprobable50,700,0000.3 % Cu150 kt2025-12-31Source
coppermeasured641,600,0000.32 % Cu2,050 kt2025-12-31Source
copperindicated698,100,0000.26 % Cu1,847 kt2025-12-31Source
copperinferred138,800,0000.28 % Cu390 kt2025-12-31Source
Production history
PeriodCommodityOre processed (t)OutputCash costAISC
2025copper15,033,00042,382 t3.72 USD—Source
Q3 2026copper2,300,0006,358 t6.11 USD—Source

Compiled from company disclosures. Refer to operator filings for official figures.

Regulatory record

Assessments, permits & orders

0 linked filings

No assessments, permits or orders are linked to Pinto Valley Mine yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.

Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.

Project history

Timeline

6 events
  1. Nov 26, 2026Stage
    Stage changed: Unclassified → Production
  2. Nov 20, 2026Stage
    First tracked by BedrockBulletin as Unclassified
  3. Nov 20, 2026Stage
    First tracked by BedrockBulletin as Unclassified
  4. Sep 2026Production
    Ore processed 2,300,000 t
  5. Dec 31, 2025Resources
    Proven copper: 803 kt · Probable copper: 150 kt · Measured copper: 2,050 kt · Indicated copper: 1,847 kt
  6. 2025Production
    Ore processed 15,033,000 t

History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.