Project Profile
Key data & status
Operator
Imperial Metals
Province / Region
British Columbia
Commodity
Gold · Copper
Stage
Unclassified
Status detail
producing
Project type
mine
Ownership
30%
Resource Estimate
—
Production Estimate
JV with Newmont (70%)
Mine Life
20+ years
Location
British Columbia
Resources & reserves
| Commodity | Class | Tonnes | Grade | Contained | As of | |
|---|---|---|---|---|---|---|
| copper | inferred | 17,100,000 | 0.3 % Cu | 50.89 kt | 2024-01-01 | Source |
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to Red Chris Mine (30% JV) yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Sep 2026ProductionOre processed 671,668 t
- 2025ProductionOre processed 2,603,861 t
- Jan 1, 2024ResourcesInferred copper: 50.9 kt
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.