Project Profile
Key data & status
Operator
Teck Resources Limited
Province / Region
USA
Commodity
Zinc · Lead
Stage
Unclassified
Status detail
Operating
Project type
mine
Ownership
100%
Resource Estimate
—
Production Estimate
500,000 - 550,000 tonnes Zn/year in concentrate
Mine Life
7+ years (Main/Aqqaluk pit mine life through ~2031)
Location
Northwest Arctic Borough, Alaska
Resources & reserves
Production history
| Period | Commodity | Ore processed (t) | Output | Cash cost | AISC | |
|---|---|---|---|---|---|---|
| 2025 | zinc | 4,500,000 | 462,700 t | 0.33 USD | — | Source |
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to Red Dog yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Dec 31, 2025ResourcesProbable zinc: 2,130 kt · Probable lead: 360 kt · Indicated zinc: — kt · Inferred zinc: — kt
- 2025ProductionOre processed 4,500,000 t
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.