Project Profile
Key data & status
Operator
Coeur Mining, Inc.
Province / Region
USA
Commodity
Gold · Silver
Stage
Unclassified
Status detail
producing
Project type
mine
Ownership
100%
Resource Estimate
—
Production Estimate
~5M oz silver/year, ~80,000 oz gold/year
Mine Life
5+ years
Location
Nevada
Resources & reserves
| Commodity | Class | Tonnes | Grade | Contained | As of | |
|---|---|---|---|---|---|---|
| gold | proven | 402,556,000 | 0.09 g/t Au | 1,162 koz | 2025-12-31 | Source |
| gold | probable | 45,100,000 | 0.12 g/t Au | 171 koz | 2025-12-31 | Source |
| silver | proven | 402,556,000 | 12.81 g/t Ag | 165,799 koz | 2025-12-31 | Source |
| silver | probable | 45,100,000 | 11.04 g/t Ag | 16,014 koz | 2025-12-31 | Source |
| gold | measured | 133,346,000 | 0.06 g/t Au | 253 koz | 2025-12-31 | Source |
| silver | measured | 133,346,000 | 9.01 g/t Ag | 38,621 koz | 2025-12-31 | Source |
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to Rochester Mine yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Dec 31, 2025ResourcesProven gold: 1,162 koz · Probable gold: 171 koz · Proven silver: 165,799 koz · Probable silver: 16,014 koz
- 2025ProductionOre processed 30,272,766 t
- 2025ProductionOre processed 30,272,766 t
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.