Project Profile
Key data & status
Operator
First Majestic Silver Corp.
Province / Region
Mexico
Commodity
Gold · Silver
Stage
Production
Status detail
producing
Project type
mine
Ownership
100%
Resource Estimate
—
Production Estimate
~8M oz AgEq/year
Mine Life
5+ years
Location
Durango
Resources & reserves
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to San Dimas Silver/Gold Mine yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 26, 2026StageStage changed: Unclassified → Production
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Sep 2026ProductionOre processed 229,188 t · AISC 31.3 USD
- Sep 2026ProductionOre processed 229,188 t · AISC 31.3 USD
- Dec 31, 2025ResourcesProven silver: 10.1 Moz · Probable silver: 13.0 Moz · Proven gold: 0.12 Moz · Probable gold: 0.17 Moz
- 2025ProductionOre processed 928,352 t · AISC 19.6 USD
- 2025ProductionOre processed 928,352 t · AISC 19.6 USD
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.