Project Profile
Key data & status
Operator
South Star Battery Metals Corp.
Province / Region
Brazil
Commodity
Graphite
Stage
Production
Status detail
Producing (phase one from Q4 2024)
Project type
mine
Ownership
100%
Resource Estimate
—
Production Estimate
—
Mine Life
—
Location
Southern Bahia, Brazil
Resources & reserves
Production history
| Period | Commodity | Ore processed (t) | Output | Cash cost | AISC | |
|---|---|---|---|---|---|---|
| 2026 | graphite | — | 1,847 t | — | — | Source |
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to Santa Cruz Graphite Project yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 26, 2026StageStage changed: Unclassified → Production
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- 2026Production
- Mar 18, 2020ResourcesMeasured graphite: 95.0 kt · Indicated graphite: 247 kt · Inferred graphite: 184 kt
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.