LiveAUGold3,772USD/oz+0.10%LiveAGSilver45.74USD/oz-0.31%LiveCUCopper5.99USD/lb+0.00%LiveNINickel7.25USD/lb+0.00%LiveLILithium Carbonate24,306USD/t+0.00%LiveUUranium85.55USD/lb+0.00%LiveZNZinc1.66USD/lb+0.00%LiveCOCobalt15.21USD/lb+0.00%FEIron Ore104.30USD/t+0.28%KCLPotash312.00USD/t+0.55%LivePDPalladium959.00USD/oz+0.00%LivePTPlatinum1,372USD/oz+0.00%LiveRHRhodium9,000USD/oz+0.00%LiveALAluminum1.29USD/lb+0.00%LivePBLead0.85USD/lb+0.00%LiveSNTin20.47USD/lb+0.00%LiveMOMolybdenum40.22USD/lb+0.00%LiveNBNiobium48.00USD/kg+0.00%LiveVVanadium14.14USD/lb+0.00%LiveCGraphite (flake)1,250USD/t+0.00%LiveNDNeodymium244.90USD/kg+0.00%LivePRPraseodymium245.40USD/kg+0.00%LiveDYDysprosium930.70USD/kg+0.00%LiveTBTerbium4,029USD/kg+0.00%LiveSBAntimony51.80USD/kg+0.00%LiveBIBismuth67.00USD/kg+0.00%LiveGAGallium2,269USD/kg+0.00%LiveGEGermanium8,598USD/kg+0.00%LiveHFHafnium12,508USD/kg+0.00%LiveINIndium972.20USD/kg+0.00%LiveRERhenium7,283USD/kg+0.00%LiveTETellurium243.30USD/kg+0.00%LiveAUGold3,772USD/oz+0.10%LiveAGSilver45.74USD/oz-0.31%LiveCUCopper5.99USD/lb+0.00%LiveNINickel7.25USD/lb+0.00%LiveLILithium Carbonate24,306USD/t+0.00%LiveUUranium85.55USD/lb+0.00%LiveZNZinc1.66USD/lb+0.00%LiveCOCobalt15.21USD/lb+0.00%FEIron Ore104.30USD/t+0.28%KCLPotash312.00USD/t+0.55%LivePDPalladium959.00USD/oz+0.00%LivePTPlatinum1,372USD/oz+0.00%LiveRHRhodium9,000USD/oz+0.00%LiveALAluminum1.29USD/lb+0.00%LivePBLead0.85USD/lb+0.00%LiveSNTin20.47USD/lb+0.00%LiveMOMolybdenum40.22USD/lb+0.00%LiveNBNiobium48.00USD/kg+0.00%LiveVVanadium14.14USD/lb+0.00%LiveCGraphite (flake)1,250USD/t+0.00%LiveNDNeodymium244.90USD/kg+0.00%LivePRPraseodymium245.40USD/kg+0.00%LiveDYDysprosium930.70USD/kg+0.00%LiveTBTerbium4,029USD/kg+0.00%LiveSBAntimony51.80USD/kg+0.00%LiveBIBismuth67.00USD/kg+0.00%LiveGAGallium2,269USD/kg+0.00%LiveGEGermanium8,598USD/kg+0.00%LiveHFHafnium12,508USD/kg+0.00%LiveINIndium972.20USD/kg+0.00%LiveRERhenium7,283USD/kg+0.00%LiveTETellurium243.30USD/kg+0.00%
Back to Projects
Mexico · Gold · Silver

Santa Elena Silver/Gold Mine

Share

Open pit and underground silver-gold mine. Record silver equivalent production of 9.6M oz in 2023.

ProducingStage · Production Updated November 20, 2026
Santa Elena Silver/Gold Mine
Project Profile

Key data & status

Operator
First Majestic Silver Corp.
Province / Region
Mexico
Commodity
Gold · Silver
Stage
Production
Status detail
producing
Project type
mine
Ownership
100%
Resource Estimate
—
Production Estimate
~10M oz AgEq/year
Mine Life
5+ years
Location
Sonora
Resources & reserves
CommodityClassTonnesGradeContainedAs of
silverproven680,00059 g/t Ag1.29 Moz2025-12-31Source
silverprobable1,220,000120 g/t Ag4.73 Moz2025-12-31Source
goldproven680,0002.29 g/t Au0.05 Moz2025-12-31Source
goldprobable1,220,0001.09 g/t Au0.04 Moz2025-12-31Source
Production history
PeriodCommodityOre processed (t)OutputCash costAISC
2025silver1,101,6131,416,862 oz14.36 USD17.96 USDSource
2025gold1,101,61388,107 oz14.36 USD17.96 USDSource
Q3 2026silver286,382368,333 oz20.65 USD27.24 USDSource
Q3 2026gold286,38218,489 oz20.65 USD27.24 USDSource

Compiled from company disclosures. Refer to operator filings for official figures.

Regulatory record

Assessments, permits & orders

0 linked filings

No assessments, permits or orders are linked to Santa Elena Silver/Gold Mine yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.

Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.

Project history

Timeline

8 events
  1. Nov 26, 2026Stage
    Stage changed: Unclassified → Production
  2. Nov 20, 2026Stage
    First tracked by BedrockBulletin as Unclassified
  3. Nov 20, 2026Stage
    First tracked by BedrockBulletin as Unclassified
  4. Sep 2026Production
    Ore processed 286,382 t · AISC 27.2 USD
  5. Sep 2026Production
    Ore processed 286,382 t · AISC 27.2 USD
  6. Dec 31, 2025Resources
    Proven silver: 1.29 Moz · Probable silver: 4.73 Moz · Proven gold: 0.05 Moz · Probable gold: 0.04 Moz
  7. 2025Production
    Ore processed 1,101,613 t · AISC 18.0 USD
  8. 2025Production
    Ore processed 1,101,613 t · AISC 18.0 USD

History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.