Project Profile
Key data & status
Operator
Eldorado Gold Corporation
Province / Region
Greece
Commodity
Silver · Lead · Zinc
Stage
Production
Status detail
producing
Project type
mine
Ownership
100%
Resource Estimate
—
Production Estimate
Variable production
Mine Life
5+ years
Location
Halkidiki Peninsula
Resources & reserves
| Commodity | Class | Tonnes | Grade | Contained | As of | |
|---|---|---|---|---|---|---|
| silver | indicated | 1,391,000 | 152 g/t Ag | 6.79 Moz | 2025-09-30 | Source |
| silver | inferred | 1,807,000 | 166 g/t Ag | 9.67 Moz | 2025-09-30 | Source |
| lead | indicated | 1,391,000 | 6 % Pb | 84,000 t | 2025-09-30 | Source |
| lead | inferred | 1,807,000 | 6.9 % Pb | 124,000 t | 2025-09-30 | Source |
| zinc | indicated | 1,391,000 | 8.4 % Zn | 117,000 t | 2025-09-30 | Source |
| zinc | inferred | 1,807,000 | 8.3 % Zn | 150,000 t | 2025-09-30 | Source |
Compiled from company disclosures. Refer to operator filings for official figures.
Regulatory record
Assessments, permits & orders
No assessments, permits or orders are linked to Stratoni Mine yet. New filings are matched automatically as they arrive. Browse everything in the Policy Tracker.
Matched by project and operator name; unclear matches are confirmed by AI. Verify details with the official source.
Project history
Timeline
- Nov 26, 2026StageStage changed: Unclassified → Production
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Nov 20, 2026StageFirst tracked by BedrockBulletin as Unclassified
- Sep 30, 2025ResourcesIndicated silver: 6.79 Moz · Inferred silver: 9.67 Moz · Indicated lead: 84,000 t · Inferred lead: 124,000 t
History items are drawn by AI from the project description; stage changes are tracked from the day the project was first added to BedrockBulletin.